{"id":2148,"date":"2026-05-14T07:33:18","date_gmt":"2026-05-14T07:33:18","guid":{"rendered":"https:\/\/aheroawasi.kisumu.go.ke\/?p=2148"},"modified":"2026-05-14T07:33:20","modified_gmt":"2026-05-14T07:33:20","slug":"kusp-2-funding-by-the-world-bank","status":"publish","type":"post","link":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/2026\/05\/14\/kusp-2-funding-by-the-world-bank\/","title":{"rendered":"KUSP 2 funding by the World Bank"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Following the successful disbursement of KUSP 2 funding by the World Bank to Ahero Awasi Municipality, a public participation exercise was conducted to identify priority development projects for implementation within the municipality.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The residents proposed the following key projects aimed at improving infrastructure, safety, and the overall environment within the town:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2705 Flood control through construction of lined drains<br>\u2705 Stone pitching within the town<br>\u2705 Greening and landscaping initiatives<br>\u2705 Installation of a high mast floodlight at Ahero Interchange<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These projects are expected to be completed by the end of June 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ahero Awasi Municipality remains committed to inclusive development through active public participation and sustainable urban transformation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Following the successful disbursement of KUSP 2 funding by the World Bank to Ahero Awasi Municipality, a public participation exercise was conducted to identify priority development projects for implementation within [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[49],"tags":[],"class_list":["post-2148","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/posts\/2148","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/comments?post=2148"}],"version-history":[{"count":1,"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/posts\/2148\/revisions"}],"predecessor-version":[{"id":2149,"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/posts\/2148\/revisions\/2149"}],"wp:attachment":[{"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/media?parent=2148"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/categories?post=2148"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/tags?post=2148"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}