{"id":2185,"date":"2026-06-21T13:03:33","date_gmt":"2026-06-21T13:03:33","guid":{"rendered":"https:\/\/aheroawasi.kisumu.go.ke\/?p=2185"},"modified":"2026-06-21T13:03:35","modified_gmt":"2026-06-21T13:03:35","slug":"the-proposed-construction-of-storm-water-lined-drains-installation-of-floodlights-and-greening-works-in-ahero","status":"publish","type":"post","link":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/2026\/06\/21\/the-proposed-construction-of-storm-water-lined-drains-installation-of-floodlights-and-greening-works-in-ahero\/","title":{"rendered":"The Proposed Construction of Storm Water lined drains, installation of floodlights, and greening works in Ahero."},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Municipality project team conducted a pre-tender site visit for the proposed construction of storm water lined drains, installation of floodlights, and greening works in Ahero.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"462\" src=\"https:\/\/aheroawasi.kisumu.go.ke\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-11-at-12.01.24-1024x462.jpeg\" alt=\"\" class=\"wp-image-2186\" srcset=\"https:\/\/aheroawasi.kisumu.go.ke\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-11-at-12.01.24-1024x462.jpeg 1024w, https:\/\/aheroawasi.kisumu.go.ke\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-11-at-12.01.24-768x346.jpeg 768w, https:\/\/aheroawasi.kisumu.go.ke\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-11-at-12.01.24.jpeg 1156w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The exercise brought together the Municipal Engineer, Physical Planner, Environmental Officer, other County staff, and prospective contractors to assess site conditions and discuss key project requirements ahead of implementation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These planned interventions are aimed at improving drainage, enhancing public safety through better lighting, and promoting a greener, more attractive urban environment for the residents of Ahero.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"462\" src=\"https:\/\/aheroawasi.kisumu.go.ke\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-11-at-12.01.25-1024x462.jpeg\" alt=\"\" class=\"wp-image-2187\" srcset=\"https:\/\/aheroawasi.kisumu.go.ke\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-11-at-12.01.25-1024x462.jpeg 1024w, https:\/\/aheroawasi.kisumu.go.ke\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-11-at-12.01.25-768x346.jpeg 768w, https:\/\/aheroawasi.kisumu.go.ke\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-11-at-12.01.25.jpeg 1156w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Municipality project team conducted a pre-tender site visit for the proposed construction of storm water lined drains, installation of floodlights, and greening works in Ahero. The exercise brought together the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2188,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[49],"tags":[],"class_list":["post-2185","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/posts\/2185","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/comments?post=2185"}],"version-history":[{"count":1,"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/posts\/2185\/revisions"}],"predecessor-version":[{"id":2189,"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/posts\/2185\/revisions\/2189"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/media\/2188"}],"wp:attachment":[{"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/media?parent=2185"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/categories?post=2185"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aheroawasi.kisumu.go.ke\/index.php\/wp-json\/wp\/v2\/tags?post=2185"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}